Systems built years ago that now slow you down, break, or that nobody dares to touch. We replace, improve or connect them — in a controlled, phased way.
Discuss your projectSee our approachOld software rarely fails all at once. It slowly becomes more expensive, slower and riskier, until replacing it is no longer optional.
The original builders have gone, documentation is missing and every change feels like a risk. Adjustments get postponed until they can wait no longer.
Licences, hosting and specialist knowledge get more expensive every year, while barely any new functionality is added.
New services, additional locations or links to other software are not possible, so plans are delayed or become more expensive.
Outdated technology no longer receives updates, creating risks for data protection, continuity and legal obligations.
Rarely a complete replacement in one go. Usually a controlled path where old and new run alongside each other for a while.
Mapping what runs, what it does and which dependencies hang off it.
Renewing part by part, so the organisation keeps working.
Transferring, cleaning and verifying historical data without loss.
Linking existing systems to modern applications instead of replacing everything.
Converting locally installed software into applications that work anywhere.
Recording how it works, so knowledge is not lost again.
Outdated processes and fragmented systems replaced by one environment — without daily operations grinding to a halt.
Repetitive financial processing replaced by a platform that connects to Exact Online.
Separate tools and manual processes brought together in one management environment.
A fragmented application process centralised in one case management environment.
With legacy, the biggest risk is not the new software but the transition. That is why we always start by understanding what is already there.
We map which systems are running, which processes depend on them, where the data sits and which integrations exist.
Not everything needs replacing. For each part we decide whether it is kept, connected or renewed — and in what order.
We design the new screens and data structure, so users can see in advance what changes and what stays the same.
We replace part by part, with old and new running side by side for a period. That keeps day-to-day operations running.
Data is transferred, checked and validated. Critical changes are scheduled outside peak times.
The old system is only switched off once everything is proven to work. After that we remain available for maintenance and further development.
Tell us about your situation. Together we map out the question, the technical options and the logical next step.
Discuss your project